Platform guide

XYZ — PRD overview

Enterprise AI-driven construction procurement (Product Requirements Document v5). Twenty modules, seven approval gates, and a BOQ-to-contract pipeline with cost, risk, and commercial controls.

Key terms

Definitions from the PRD module specifications.

BOQ (Bill of Quantities)
Priced construction line items (description, quantity, unit, rate, amount) ingested from Excel/CSV. Entry point for all procurement data (Module 3).
WBS (Work Breakdown Structure)
Scope hierarchy inferred from BOQ descriptions (building → zone → floor → area). Proposed, reviewed, and approved at Gate 0 before applying paths to items. Gate 0 is optional and can be disabled in workflow settings.
WP (Work Package)
Procurement unit: classified BOQ lines grouped by WP code from the company WP library (up to 256 codes). Each WP receives budget split, execution strategy, RFQ(s), and contract(s).
Classification
Assigning each BOQ line to a WP code via a three-layer cascade: vector similarity (~80% of items), keyword dictionary, then LLM fallback. Low-confidence lines go to a human review queue (Module 4).
Sub-package
When execution strategy is SPLIT (or HYBRID), a WP is divided into 2–6 procurable slices — each with its own vendors, RFQ, bid, and contract path.
RFQ (Request for Quotation)
Formal tender for a sub-package: scope, BOQ lines, deadline, commercial terms. Lifecycle: draft → published → closed → awarded or cancelled. Publishing may require Gate 4 approval (configurable).
Bid
Vendor's priced response to a published RFQ, submitted through the Vendor Portal (Module 10).
MCDA
Multi-Criteria Decision Analysis on bids (Module 11). Default weights: price 35%, technical 25%, schedule 15%, track record 15%, risk 10% — configurable per project.
Award
Formal recommendation to appoint a winning vendor after MCDA evaluation. Gate 3 is always required and cannot be disabled (financial commitment).
Gate (0–6)
Seven approval checkpoints enforced by the Workflow Engine (Module 19): G0 WBS · G1 work packages · G2 execution strategy · G3 award · G4 RFQ publish · G5 contract activation · G6 quantity revision / VO.
Authority matrix
Per-role SAR limits and approval types (wbs, package, strategy, rfq, award, contract, quantity revision, cost, etc.) configured in Company Settings → Approval Authority.
Contract
Procurement contract auto-created when an award is approved; engineer reviews and activates at Gate 5. Tracks milestones, amendments, and lifecycle status.
VO (Variation Order)
Groups multiple approved quantity revisions with a single cost delta and commercial narrative. Submitted for approval at Gate 6; batch-approves linked revisions on approval.
EVM (Earned Value Management)
Daily cost snapshots vs revised budget baseline — CPI, SPI, EAC, trend analysis, and anomaly detection (Module 15). Baseline uses revised_budget after quantity changes.
Responsibility matrix
Maps implicit BOQ cost assumptions (scaffolding, cranes, permits, accommodation, etc.) to contractor, employer, or shared ownership — used for commercial alignment and VO cost impact (Module 14).

Approval gates

Seven gates orchestrated by the Workflow Engine (Module 19).

GateApprovalRequirement
G0WBS approvalOptional (can be disabled)
G1Work package approvalBefore strategy / RFQ path
G2Execution strategy approvalBefore vendor matching & RFQs
G3Award approvalAlways required
G4RFQ publish approvalOptional (project config)
G5Contract activationBefore contract is active
G6Quantity revision & VOPost-baseline changes

20 modules

Numbered modules from PRD v5 (Company Settings through Dashboard & Reports).

01

Company Settings

Master governance layer (Admin only): profile, users, roles & permissions, approval authority, workflows, approval cycles, WP library, strategy/budget templates, classification governance, vendor taxonomy, notification rules, governance config.

Downstream: All company rules inherit into every project and module below.

02

Project Settings

Per-project setup before procurement: profile, team, commercial config, WP activation, budget/strategy overrides, workflow overrides, procurement parameters, documents.

Downstream: Project overrides resolve above company defaults; feeds BOQ through cost modules.

03

BOQ Upload & Smart Parse

Ingest Excel/CSV BOQ (Smart Parse + COPY ingestion). Includes WBS pattern extraction, LLM hierarchy consolidation, proposal review, and Gate 0 WBS approval.

Downstream: Parsed lines → Classification Engine; WBS paths → downstream grouping.

04

Classification Engine

Assign WP codes via vector → keyword → LLM cascade; review queue for uncertain lines; governance thresholds from Company Settings.

Downstream: Classified items → Work Packages (auto-group by WP code).

05

Work Packages

Auto-generate packages from classified lines (totals, item counts). Gate 1 package approval before strategy and tendering.

Downstream: Approved packages → Budget Engine and Execution Strategy.

06

Budget Engine

Deterministic 6-category split per WP (supply, material, equipment, manpower, subcontract, misc) via 4-level template resolution chain.

Downstream: Category distribution → Cost Control variance analysis.

07

Execution Strategy

Human procurement decision per WP: SINGLE, SPLIT, HYBRID, or IN-HOUSE. Strategy wizard and templates; Gate 2 approval before vendor/RFQ work.

Downstream: Sub-packages → Vendor Matching and RFQ Management.

08

Vendor Management & Matching

Qualified vendor registry with prequalification and performance scoring. Matching engine: capability 40%, budget fit 35%, performance 25%.

Downstream: Shortlists → RFQ vendor invitations.

09

RFQ Management

Create RFQs from approved sub-packages, invite vendors, manage deadlines/clarifications, publish (Gate 4 when enabled), close and award.

Downstream: Published RFQs → Vendor Portal; responses → Bid Evaluation.

10

Vendor Portal

Isolated external interface: view RFQ scope, enter line pricing, upload documents, submit bids (token links or vendor accounts).

Downstream: Bid submissions → Bid Evaluation & Awards (staff side).

11

Bid Evaluation & Awards

MCDA scoring, comparison matrix, commercial risk assessment, AI award narrative, outlier detection. Gate 3 mandatory award approval.

Downstream: Approved award → Contract Management (auto-create).

12

Contract Management

Contracts from approved awards; milestones, amendments, 6-state lifecycle. Gate 5 contract activation.

Downstream: Active contracts → Cost Control committed/actual values and Quantity Updates.

13

Quantity Update

Immutable BOQ baseline with revision history; quantity revisions and Variation Orders at Gate 6.

Downstream: Approved revisions/VOs → revised budget and Cost Control.

14

Responsibility Matrix

Commercial control: make implicit unit-rate assumptions visible (who pays scaffolding, cranes, permits, etc.).

Downstream: Ownership rules → bid commercial alignment and VO cost impact.

15

Cost Control & EVM

Daily financial snapshots, CPI/SPI/EAC, trend analysis, anomaly detection against revised budget.

Downstream: Aggregates budget, contract, and quantity data → Dashboard & Reports.

16

Risk Monitoring

Automated daily scans plus manual risks across cost, schedule, vendor, scope, compliance, and safety categories; mitigation tracking.

Downstream: Risk flags → Notifications and executive Dashboard.

17

Audit Trail

Immutable log of every create/update/delete with user, timestamp, old/new values — cannot be edited or deleted.

Downstream: All modules that change data.

18

Notifications

Event-driven in-app inbox and email (approvals, bids, deadlines, risks, SLA) per notification rules in Company Settings.

Downstream: Workflow Engine and module events.

19

Workflow Engine

Generic state machine for seven entity types: guards, multi-stage approvals, escalation, SLA, audit and notification triggers.

Downstream: Powers every gate (G0–G6) across procurement modules.

20

Dashboard, Reports & Analytics

Project KPI landing page (pipeline, financials, activity feed) and parameterized PDF/Excel reports.

Downstream: Read-only aggregation across all modules.

Roles

Six default system roles (FR-COM-03) plus external vendors.

  • Admin50Company Settings and full platform configuration. Only role with company-level admin access.
  • Decision Maker30Executive approver in workflow hierarchy; higher authority for award and financial decisions.
  • Procurement Manager20Owns execution strategy (SINGLE/SPLIT/HYBRID/IN-HOUSE) and procurement pipeline decisions.
  • Finance Controller15Budget oversight, cost/EVM, quantity revisions, VOs, and commercial financial approvals.
  • Procurement Engineer10BOQ ingest, WBS, classification review, packages, RFQs, bids — technical procurement execution.
  • Viewer0Read-only access; cannot be designated as a workflow approver.
  • VendorExternal Vendor Portal only (Module 10) — not a staff role.

Procurement flow

End-to-end sequence across PRD modules. RFQ publish (G4) happens before award (G3). Workflow Engine, Audit, and Notifications run throughout.

1
Company Settings

Configure governance, WP library, workflows, authority, templates.

2
Project Settings

Create project; inherit or override company defaults.

3
BOQ upload & parse

Smart Parse / COPY ingestion; optional WBS pattern extraction.

4
WBS proposalG0

Review hierarchy; Gate 0 approval (optional gate).

5
Classification

Vector → keyword → LLM cascade; clear review queue.

6
Work packagesG1

Auto-group by WP code; Gate 1 approval.

7
Budget resolution

6-category split per WP from template chain.

8
Execution strategyG2

SINGLE / SPLIT / HYBRID / IN-HOUSE; Gate 2.

9
Vendor matching

Weighted shortlist per sub-package.

10
RFQ publishG4

Invite vendors; Gate 4 when enabled.

11
Bids via portal

Vendors submit pricing; staff run MCDA evaluation.

12
AwardG3

Recommend winner; Gate 3 (always required).

13
ContractG5

Auto-create from award; Gate 5 activation.

14
Quantity & VOG6

Revisions and variation orders; Gate 6.

15
Ongoing control

Cost/EVM, Risk, Responsibility matrix, Dashboard — parallel through project life.